# Task guides

One guide per screen or gesture. Each answers a question asked in plain language — "how do I shift a whole project by a week without breaking dependencies", not "reference: `period.move`".

- [The timeline: blocks, links and milestones](/docs/en/guides/timeline-blocs-et-dependances/)
- [The grid and columns](/docs/en/guides/grille-et-colonnes/)
- [The calendar, closures and absences](/docs/en/guides/calendrier-fermetures-absences/)
- [The legend and the filter](/docs/en/guides/legende-et-filtre/)
- [A block's actions and its derived progress](/docs/en/guides/actions-et-avancement/)
- [Sharing and roles](/docs/en/guides/partage-et-roles/)
- [Publishing](/docs/en/guides/publication/)
- [History and Compare](/docs/en/guides/historique-et-comparer/)
- [Comment threads](/docs/en/guides/fils-de-commentaires/)
- [Notifications and the evening mail](/docs/en/guides/notifications-et-courrier/)
- [Exclusive editing](/docs/en/guides/edition-exclusive/)
- [Versions and the trash](/docs/en/guides/versions-et-corbeille/)
- [Printing and exports](/docs/en/guides/impression-et-exports/)
- [My schedules: search, duplicate, templates](/docs/en/guides/mes-plannings/)
- [Absences: My absences, the Agenda, risks](/docs/en/guides/absences/)

To create your first schedule and find your way around the timeline before going further, see [Getting started](/docs/en/demarrer/).
