# My schedules: search, duplicate, templates

This is the home screen (`/`): the list of your schedules, and what you can do to them without opening them — search, duplicate, keep as a template, move to the trash.

## The list and search

The table shows, per schedule: **Name**, **Rows**, **Blocks**, **Modified on**, **Modified by**. Clicking a header sorts by it.

The **Search…** field, at the top, filters the list live, with no accent or case sensitivity: type "reno" and only schedules whose name contains that string of letters stay visible. Nothing to confirm, nothing to reset besides clearing the field.

## Creating a schedule

The **New schedule** button opens a text field in its place; type a name and click **Create** (the full walk-through, with the first block, is in *[Creating your first schedule](/docs/en/demarrer/premier-planning/)*).

## On each row: five gestures

Every schedule carries a row of buttons:

- **Open** — same as clicking the name.
- **Rename** — a text field replaces the name, in place.
- **Duplicate** — copies right away, with no prompt: groups, rows, blocks, icons, links, comments, legend, with fresh identifiers. The copy is called "Copy of *name*" and shows up in the list at once; a message confirms it ("*name*" copied.).
- **Versions** — this schedule's version history, without opening it (the same screen as the editor's *Versions* button — see *[Versions and the trash](/docs/en/guides/versions-et-corbeille/)*).
- **Save a copy as a template** — see below.
- **Delete** — asks for confirmation in place (**Delete** / **Cancel**) before moving the schedule to the trash (see *[Versions and the trash](/docs/en/guides/versions-et-corbeille/)*). Nothing is lost right away.

## Templates

**Save a copy as a template** takes a snapshot of the schedule as it is right now and places it in the **Templates** gallery — the original schedule, itself, doesn't change and stays in the normal list. The **Templates (N)** button, at the top, opens that gallery.

A template is a schedule whose dates are relative to its start: from the gallery, **Create a schedule** asks for a **Start date** and, optionally, a name (otherwise the template's own name is used); the whole content shifts in working days from that date. This is how you keep a standard type of project (the same phases, the same durations) and replay it at a different date each time, without redrawing the blocks.

## The trash

The **Trash (N)** button, at the top, lists what's been deleted: **Name**, **Rows**, **Blocks**, **Deleted on**, **Purged on**, and a **Restore** button. A deleted schedule stays readable there for thirty days before being purged for good — the full detail is in *[Versions and the trash](/docs/en/guides/versions-et-corbeille/)*.

## What this page doesn't cover

- **What you see once the schedule is open** (the timeline, the grid): see *[The timeline: blocks, links and milestones](/docs/en/guides/timeline-blocs-et-dependances/)* and *[The grid and columns](/docs/en/guides/grille-et-colonnes/)*.
- **Importing a schedule from a file** (v23, CSV, ICS, MS Project): this gesture doesn't exist yet in this screen — see the note about it in *[Printing and exports](/docs/en/guides/impression-et-exports/)*.
- **Sharing a schedule with someone else**: see *[Sharing and roles](/docs/en/guides/partage-et-roles/)*.
