Skip to content
PalmaPlan — the wiki ← PalmaPlan

The timeline: blocks, links and milestones

This guide builds on the vocabulary laid out in Understanding the timeline in five minutes and details the gestures: drawing, moving, linking two blocks, placing a milestone, locking.

Drawing a block

On a named row, click in the time grid where the block should start and drag horizontally to the end date, then release. A blue block appears with a text field ready to receive its name; type it and confirm with Enter. A start date that falls outside a working slot (a weekend, a closure) is snapped to the next one.

If the text field doesn't open, or you want to rename a block later, right-click the block › Edit the label does the same thing at any time.

Moving, resizing, recoloring

Milestones (icons)

A milestone is an icon placed on a precise date rather than a duration — a site handover, a meeting, an alert. It's placed and handled like a block (right-clicking an empty cell in the time grid offers to insert one), moves, gets renamed and locked the same way.

Linking two blocks (or icons)

From a block's right-click menu, Add a dependency then aim at the second element. A link states that the target can't start before the origin is finished (the most common direction; others are possible — finish-to-finish, start-to-start…).

Two kinds of link, visible on screen:

What happens when you get it wrong

What this page doesn't cover